From four CSVs to a JORC-aligned resource in eight weeks.
A mid-cap iron ore developer replaced a three-vendor stack — CSV wrangler, desktop kriging suite, spreadsheet economics — with a single SRES tenant. Their next resource statement shipped on schedule with a full reproducibility snapshot.
- Three separate tools each owning one slice of the workflow.
- No unified audit trail — every re-run required a fresh chain of custody.
- Board-ready CPR PDFs assembled manually in Word from a dozen source files.
- Ingested 112 drillholes (Collar / Survey / Assay / Geology) into SRES with zero manual column mapping.
- Built the Fe block model with Ordinary Kriging plus per-lithology density mapping.
- Generated the CPR PDF, DOCX, cut-off sensitivity report and continuous drill-log bundle in a single day.
